32,000 square meter tailings dam project
Execution of the Geomembrane Lining Project at the Takab Gold Mine Tailing Dam The execution of the geomembrane lining project at the Takab gold mine tailing dam, covering an area of approximately 32...
Geopoosh Flagship Projects; Proving Capabilities in Complex Infrastructure and Technical Field Challenges