32,000 square meter tailings dam project
Execution of the Geomembrane Lining Project at the Takab Gold Mine Tailing Dam The execution of the geomembrane lining project at the Takab gold mine tailing dam, covering an area of approximately 32...
Geopoosh Flagship Projects; Proving Capabilities in Complex Infrastructure and Technical Field Challenges
Execution of the Geomembrane Lining Project at the Takab Gold Mine Tailing Dam The execution of the geomembrane lining project at the Takab gold mine tailing dam, covering an area of approximately 32...
Execution of the Geomembrane Lining Project at the Saveh Copper Mine Heap Leaching Pad The geomembrane lining project for the heap leaching pad at the Saveh copper mine, spanning an area of approxima...
Execution of the Geomembrane Lining Project at the Khorramabad Combined Cycle Power Plant Evaporation Pond The geomembrane lining project for the evaporation pond at the Khorramabad Combined Cycle Po...